On 8 November 2018, the official inauguration of a brand new furnace in the hot dip galvanising line Sidgal 3 in Ghent took place, in the presence of Honorary Governor Jan Briers. With the arrival of the new furnace - called Sidgal 3 Upgrade - we are able to realise very sophisticated and very specific temperature curves, something that was not possible with the existing furnace. This gives us a unique product that is up to 20% lighter, but at the same time very strong and highly deformable. The new furnace forms the final element in the Fortiform® investment chain.
The first production of Sidgal 3 Upgrade took place earlier, at the beginning of May 2018, after a construction period of only 26 months. Within a very short period, it became possible to produce a number of existing products of Sidgal 3 in the Sidgal 3 Upgrade. At the end of 2018, customer deliveries were already made of deep drawing steel, Interstitial Free (IF) steel, High Strength Steel (HSS), bake hardening steel and High Strength Low Alloy (HSLA) steel. In early 2019, Dual Phase steel DP600 was also released. Apart from transferring the existing products of Sidgal 3 to Sidgal 3 Upgrade, a number of new products were developed at a very high pace. Our Dual Phase DH products were made available for customers to order from the end of 2018. In addition, we successfully produced the first coils of Fortiform®980 and Q&P1180.